Internal works - 6
Internal works - 8


Plastering

The oak frame was battened and the rooflights packed out ready for the plasterer.

ufh

We also had a delivery of the stone for the flooring. This was delivered in 5 pallets which had to be unpacked and moved. One pallet was moved into the house while the remaining 4 were moved into the garage. Just over 4 tons in total!

ufh

The front tile is the smallest at only 600mm x 700mm, the largest ones are 600mm x 1000mm. Whatever the size they are heavy.


Internal works - 8
Internal works - 6